Equipment Management: The Fleet That Shows Up Before Anyone Else Does

By Christine Ave V. Tragura with contributions from Vicky V. Santoyo (HR and Admin Manager for Allied Services Group) on November 3, 2026

Aside from construction plans, we often overlook an integral component of construction: the equipment that builds a project. Cranes, lowbed trailers, and crawlers often get held up at weighbridges or stuck waiting for permits, delaying the start of work on site. The Equipment Management Group (EMG) under Allied Services Group (ASG) takes these problems off your plate.

 

ASG runs a self-owned fleet of thousands of units and offers “all-in” services that include: the equipment, plus the permits, operators and personnel, and fuel needed to get it working. No weighbridge holdups, no permit delays, no chasing down operators. The equipment simply arrives on site, ready to work, and the results are visible long before project handover.

 

This article gives a quick refresher on the EMG fleet, confirms that all of its equipment is available for rent, outlines the fleet’s capabilities, and highlights ASG’s external clients along with sample projects.

 

All equipment featured here is available for rent to third parties. To inquire, contact ASG at asginquiries@dmcinet.com.

 

Sample clients include:

 

1. OVR Builders

2. Sinotech Asia Construction Inc.

3. Huayou Construction

4. Trevi Foundations Philippines

5. Hitachi - Sen Yeh Philippines Inc.

6. ACCIONA EEI Joint Venture

 

 

ONE FLEET, ELEVEN CAPABILITIES

 

ASG’s Equipment Management Group (EMG) manages a large fleet of equipment, which can be categorized into eleven functional sections, namely:

1. Lifting

2. Hauling

3. Excavating

4. Concreting

5. Track works

6. Pile driving

7. Earth moving

8. Air equipment

9. Power generation

10. Shop equipment

11. Compaction

 

There are over a thousand pieces of light and heavy equipment managed by the Group’s fleet.

 

Here is a sample of the ASG equipment management fleet. The full list is available upon inquiry.

 

 

 

 

WHAT THE FLEET IS ACTUALLY DOING

 

From looking at brochures to finding out where ASG’s equipment is working today, there is a huge array of plant and machinery to choose from.

 

Transfer of LP Rotor Turbine and Container Vans
Location: Calaca City, Batangas | Client: South Luzon Thermal Energy Corporation | Completed: June 26, 2026

 

The job shown above was completed in just 2 days; ASG successfully executed the transfer of an LP rotor turbine (36.0T) and container vans, delivering precision and efficiency for their energy sector partner.

 

Hauling of Crusher Machine
Location: Paete, Laguna | Client: OVR Builders | Completed: March 14, 2026

 

Heavy equipment, handled with expertise. ASG’s 80T Lowbed Trailer (4-axle) safely hauled a crusher machine to site - another successful delivery for ASG’s customer OVR Builders.

 

 

Erection of Chimney, Steel Asia

Location: Lemery, Batangas | Client: OVR Builders | Completed: June 5, 2026

 

Standing tall! ASG completed the erection of an industrial chimney using a 250T Crawler Crane, showcasing their capability in precision heavy lifting.

 

Mobile Crane Rental – SMDC Twin Residences
Location:
Las Piñas City | Client: Sinotech Asia Construction Inc. | Completed: July 8, 2026

 

Supporting vertical construction with their 30T Mobile Crane at SMDC Twin Residences. ASG is proud to be part of this residential development's progress.

 

Tower Crane Dismantling & Erection - SMDC South Residences
Client: Sinotech Asia Construction Inc.

 

Precision at height. ASG’s 200T All Terrain Mobile Crane is handling the dismantling and erection of three units of tower cranes at SMDC South Residences and SMDC Twin Residences.

 

 

Earthworks - 550MW Bugallon Solar Power Project

Location: Pangasinan | Client: Huayou Construction | Completed: September 9, 2026

 

Shaping the ground for renewable energy. ASG's excavators and a grader were on-site supporting earthworks and site development for this major solar power project.

 

Drilling Works - SCRP CP-S07 South Depot - Lotte Gulermark EEI Joint Venture
Location: Banlic, Laguna | Client: Trevi Foundations Philippines | Completed: October 20, 2026

 

Going deep for strong foundations: ASG’s Drill Rig SR-075 is on a 6-month contract supporting foundation works with their business partner Trevi Foundations for the SCRP South Depot project in Banlic, Laguna, joined by a full fleet of 5 excavators, a road grader, and a road roller - supporting the South Depot foundation works and site development.

 

 

ADHI PTP Joint Venture - MCRP CP01

Completed: August 6, 2026

 

Extraction of sheet piles made possible with ASG’s 80T Crawler Crane and Vibro Hammer, supporting infrastructure works for the MCRP CP01 project.

 

South East Metro Manila Expressway Project
Location:
Arca South, FTI Taguig | Client: Trevi Foundations Philippines | Completed: July 20, 2026

 

ASG’s 100T Crawler Crane was on-site supporting foundation works for the South East Metro Manila Expressway - driving progress on major infrastructure.

 

Hauling of Rails - NSCR CPS04

Client: Hitachi - Sen Yeh Philippines Inc. | Completed: September 2026

 

Keeping the rail project on track! ASG’s tractor trucks with extendable trailers were transporting rails for the NSCR CPS04 project.

 

Malolos Clark Railway Project
Client: ACCIONA EEI Joint Venture | Completed: September 20, 2026

 

ASG’s 55T Straddle Carrier was on a 6-month deployment supporting the Malolos Clark Railway Project at its casting yard - moving the nation's rail infrastructure forward.

 

 

Different clients, different industries, different contract lengths, from a two-day turbine transfer to a six-month foundation drilling program. Yet, it is all ASG’s fleet: deployed project by project, often to more than one site at once.

 

 

THE PART THAT DOESN'T MAKE THE BROCHURE

 

Every one of these projects has contract values and completion dates with signatures from clients. More important, however, is the risk involved. Project owners can count on ASG to minimize risk: running a chimney erection nonstop for 120 hours or more; dismantling a tower crane three times on an occupied residential building; deploying equipment for six months or longer, working 24/7. Each of these is a risk, but it’s a risk taken so the equipment is put to its best use. That’s what Equipment Management is all about.

 

 

With ASG’s Equipment Management Group (EMG), you gain a trusted partner committed to ensuring that potential risks are not only recognized but also diligently addressed before they become concerns.

 

Wheeled Excavator and Crawler Excavator – excavating equipment owned by Allied Services Group (ASG)

 

 

 

 

 

ABOUT THE AUTHOR

Christine Ave V. Tragura, MBA, CLSSYB

Ave is a licensed Civil Engineer with over 16 years of international engineering and infrastructure experience across the construction, oil and gas, mining, manufacturing, and energy sectors in the Philippines and Singapore. She is currently serving as Digital Communications Senior Supervisor at D.M. Consunji, Inc. (DMCI).

More News

October 27, 2026

Rooted in Sustainability, Committed to the Future: DMCI Joins the National Greening Program

October 26, 2026

Allied Services Group: The Muscle, The Mix, and The Machinery Behind Every DMCI Build

October 19, 2026

The Story of Mankind, Construction, and Civil Engineering, Told by A Builder

All News

Equipment Management: The Fleet That Shows Up Before Anyone Else Does November 3, 2026

Rooted in Sustainability, Committed to the Future: DMCI Joins the National Greening Program October 27, 2026

Allied Services Group: The Muscle, The Mix, and The Machinery Behind Every DMCI Build October 26, 2026

The Story of Mankind, Construction, and Civil Engineering, Told by A Builder October 19, 2026

Success Stories - Early Contractor Involvement (ECI) with Pioneer Insurance and Surety Corporation September 28, 2026

Breaking Through: MMSP CP 102 NDJV Achieves Tunnel Breakthrough Milestone September 24, 2026

Technical Insights Series Article 5 - The Role of Building Information Modeling (BIM) in Modern Construction September 21, 2026

History in the Making: DMCI Joins the Metro Manila Subway Project's CP109 Groundbreaking Ceremony September 18, 2026

Technical Insights Series Article 4 - Typhoon-Resilient Structures: Designing for Extreme Weather September 14, 2026

Lessons From Diego Garcia: A Conversation with Engr. Ronaldo Elepaño Jr. August 18, 2026

Excellence in Action: DMCI's Successful 4th ISO Surveillance Audit August 14, 2026

St. Luke’s Medical Center-QC New Hospital Building Project Achieves 3 Million Safe Manhours without a Lost Time Incident (LTI) August 8, 2026

Engineering Lessons from DMCI's Experience in Diego Garcia August 5, 2026

Celebrating 5 Million Safe Manhours at the 88 MLD Las Piñas Water Reclamation Facility Project July 31, 2026

DMCI Mid-Year Planning: Reflecting on Performance, Strengthening the Path Forward July 25, 2026

Technical Insights Series Article 3 - Earthquake-Resistant Building Design in the Philippines July 13, 2026

DMCI Congratulates DLSU Laguna on Its LEED Silver Certification Milestone July 10, 2026

Amani Tower Project Achieves 1 Million Safe Manhours Without a Lost Time Incident (LTI) July 4, 2026

PHILCONSTRUCT 2026: Showcasing Leadership, Innovation, and Industry Collaboration July 3, 2026

De La Salle-College of Saint Benilde David M. Consunji Ideation Room Naming Ceremony July 1, 2026

DMCI Conducts Nationwide Simultaneous Earthquake Drill to Strengthen Emergency Preparedness June 18, 2026

Technical Insights Series Article 2 - How Megaprojects are Reshaping Philippine Infrastructure June 9, 2026

Technical Insights Series Article 1 - Structural Considerations When Designing a Power Plant May 28, 2026

The new Pioneer Cold Storage is one step closer to completion! January 20, 2026

DMCI Technical Insights Series May 28, 2026

La Salle Greenhills Senior High School, International Baccalaureate (IB), and Performing Arts Building Topping-Off Ceremony May 18, 2026

St. Luke’s Medical Center New Hospital Building Topping-Off Ceremony April 23, 2026

Bringing Government Services Close to Our Employees - Launching of SSS Offsite E-Center February 26, 2026

Enrique K. Razon Jr. Hall & University Hall - The country's first LEED Silver Certified Academic Buildings February 12, 2026

1st EHS Central Committee Meeting for 2026 January 12, 2026

Bridging the Skills Gap: Training the Next Generation of Builders November 24, 2025

DMCI is 13th GKK’s Regional Winner! October 16, 2024

Republic of the Philippines Award for Manila LRT Line 2- East Extension Project March 5, 2019

DMCI successfully completes IMS recertification October 7, 2024

CIC inks P3.3-B deal with DMCI for C5 Link Segment 3B construction May 23, 2024

DMCI supports Hooked on Book (HOB) Library October 15, 2023

Continued Certification of DMCI’s Integrated Management System September 1, 2023

Continued Certification of DMCI’s Integrated Management System February 16, 2023

DMCI-Nishimatsu joint venture bags subway contract October 3, 2022

DMCI supports relief operations to typhoon-stricken areas January 9, 2022

DMCI on its way back to prepandemic profit level this year August 11, 2021

DMCI vaccinates over 4,000 employees July 9, 2021

From Ikea to Dagat-Dagatan: DMCI begins work on biggest wastewater facility March 19, 2021

Blessed Consunji Group pays it forward January 24, 2021

More than 5,000 youths to get skills training from USAID, PBEd; Aboitiz, DM Consunji to provide pre-employment support December 7, 2020

DMCI order book leaps 152% to P65.8 B in H1 August 14, 2020

Full blast construction of NLEX connector to start this year February 24, 2020

More firms eye bidding for Manila subway contracts February 24, 2020

MRP Foundation-funded PSG Station Hospital topped off February 24, 2020

DMCI Works Double Time on Infra Projects September 3, 2019

First dedicated OFW hospital, diagnostic center begins construction in Pampanga February 20, 2020

Ceremonial Track-laying for LRT Line 2- East Extension Project Package 3 April 16, 2019